atmos:glacialridge:february_9_2012

February 9, 2012 Visit Tasks

  • Network was down. One of the UPS was not on. The profiler and Glacialridge computers, along with the network equipment was connect to this UPS. Quick check seem to indicate a UPS problem so brought UPS back to Grand Forks. Connect profiler computer to profiler UPS and other equipment directly in wall out let. In addition to the UPS, the DSL modem was not working. Lucky the telephone repair person was working next door and he was able to swap out the DSL modem which fixed the problem.
  • The second USB hard drive was connect to the profiler computer. The profiler computer writes date to both drives, so one of these drives should be sent back when it is half full.
  • The USB hard drive was swapped out on the Glacial Ridge computer.
  • The four radiation instruments were removed and brought back to Grand Forks. The data logger for these had already been removed.
  • The video camera system was checked out. Could communicate with the camera and change configuration. However, only received white (blank) images. Brought back old camera network cable.
  • Turn down the heaters slightly.

Tasks Before Next Trip

  • Test out the UPS. See if it works. See if it need batteries.
  • Test out the old camera network cable. Maybe it can be fixed and used instead of the current one.
  • Figure out why the website is timing out when trying to access the weather data page.
  • Both USB drives are not working on the USB hub. Find different solution.