Ryan Kucera Undergraduate Research Meeting Notes

July 30, 2020

Attending: David Delene, Ryan Kucera

Items

* Mounting on Trailer

  • 4 ft 1 inch pole.
  • 5 sensor, individually connect.
  • Make new cables as necessary.
  • Put Rassbery Pi inside, connect to monitor.
  • Ordering -
  • Got cable, filament.
  • Have different diode and photo sensor.

Tasks

* Ryan

  • Send links to get ordered.
  • Lab Supply - Need Power Supply.

August 20, 2020

Attending: Brianna (NCAR), Ryan, David Delene

Discussion

  • 3D-PAWS, Status: Need to get Wifi. Will work with Andy. Going to WMI.
  • GPS Location: Additional GPS Board put in Rassberry Pi, add a latitude/longitude to data stream.
  • Brainna,
  • Talked about measurement inter-comparison.
  • New person, started in June.
  • Nothing yet about intercomparison.
  • Could get from CORES Web site. Please send me information.
  • Vis Sensor
  • Have one set of sensor
  • Get together and take apart Vis sensor.
  • Andrew - Work on 3D-PAWS.

Meeting next week. Thursday 11 Central.

August 27, 2020

Attending: Brianna (NCAR), Ryan, David Delene

Discussion

  • 3D-PAWS Will on roof two today.
  • Fixed 3D-PAWS is working.
  • Visibility Sensor, We need to get the sensor connect so we get output. Photodector that we have is optical sensor IR 850nm Broadcom limite(APDS-9190, Digi-key 516-2663-1-ND, see Data Sheet).

Tasks

Meeting - Thursday at 1 pm. Have another meeting at 11 am

September 3, 2020

Attending: Brianna (NCAR), Ryan, David Singewald, David Delene

Discuss

  • Wireless does not on roof. We get two 25 ft. cables. Emailed help desk. Need one 25 ft network cable and one 50 ft network cable.
  • 4 ft metal support poles, 1.5 diameter. Winds bend the stand PVC.
  • Going to order another power extension cable and power bars.
  • We sent in request to order cable to make extension cables for the Met Trailer.
  • API Key to get the data. Test to see if we can get data.
  • Teamviewer is already installed.

Tasks

  • David Delene
    • Check on if API key work to get data.
  • David Singewald
    • Check the 3D sondi on Clifford Hall.
  • Brianna
    • Send information about Web display software. Will ask Maddi getting. Some back-end example 3D-PAWS, the we'll move to the instrument.
    • GPS unit is still being tested. Will update when ready. For now, just do manual positions.
  • Ryan
    • Search Google Scholar and see find how to make 850 nm 42 degree visibility sensor.
    • Put names of sensor and laser diode on the page.
    • Link 64 SD cards for Pi version 4.
    • Set standard Teamviewer password.

Try to be around on Sunday.

Talk next week at 1 pm Central.

September 10, 2020

Attending: Brianna (NCAR), Ryan, David Delene

Discussion

  • Brianna

https://earthcubeprojects-chords.github.io/chords-docs/

  • Ryan
    • Will check on SD card.
    • Getting Pis on the network.
    • Re-image SD not working. Windows 10 Disk Image (has worded before). Ryan blanked and it did not work.
    • The two metal poles work well.
    • Issue with high winds affecting rain gauge.
  • Visibility Sensor.
  • Tasks
    • David
      • Sunday - Image the SD cards. Look more SD cards.
    • Ryan
      • Email Andy about wire network connections.
      • Document rain gauge issue on Wiki, Work on Wiki.

David and Ryan will be in lab on Sunday. Meet Next Week..

October 1, 2020

Attending: Ryan Kucera, David Delene

Discussion

  • Met Trailer 3d-paws. Extension cables are build.
  • Tasks
    • Ryan
      • Check lap for Extension cord.
      • Test Met 3d-paws in CH601 on Sunday.
      • Plan to work on the visibility sensor.
      • Plan to put 3d-paws outside of CH601.
    • David
      • Order additional extension cords. Sent Email to Wanda.

Plan on meeting at 1 pm next week.

October 8, 2020

Attending: Ryan Kucera, Brianna (NCAR), David Delene

Discussion

Tasks

  • Ryan
    • Get all instruments working on UND00200 and UND00300 outside of Clifford Hall 601.
  • David
    • Bring in USB to A/C adaptor.

Plan on meeting at 1 pm next week. Also be in 11-5 on Sunday.

October 15, 2020

Attending: Ryan Kucera, David Delene

Discussion

  • Working on UND00300 (Met Trailer). Everything is getting data. Radiation shield issue. Wind and rain working to data but not going to data site.
  • Visibility Sensor (Nothing new).

October 22, 2020

Attending: Ryan Kucera, Brianna (NCAR), David Delene

Discussion

  • Web site issues.
  • Ryan has UND00100 up in Clifford Hall 601 and on site. Without extension cables.
  • Need to figure out how to anchor rain gauge to bricks outside of CH601.
  • Should bring UND00300 inside to fix winds, but first need to UND00100 working with extension cables.
  • Brianna
    • Could learn on existing portal.
    • Would have our CORDS portal. Visible is different.
    • Could setup server. Could have our own Portal.
    • Maddi to help with data/software side.
  • David
    • What first step in learning CORDS/data system.

Tasks

  • Ryan
    • Test extension cables.
  • David
    • In CORDS, change the location. I should have permission.