This is an old revision of the document!
Table of Contents
Ryan Kucera Undergraduate Research Meeting Notes
July 30, 2020
Attending: David Delene, Ryan Kucera
Items
* Mounting on Trailer
- 4 ft 1 inch pole.
- 5 sensor, individually connect.
- Make new cables as necessary.
- Put Rassbery Pi inside, connect to monitor.
- Ordering -
- Got cable, filament.
- Have different diode and photo sensor.
Tasks
* Ryan
- Send links to get ordered.
- Lab Supply - Need Power Supply.
August 20, 2020
Attending: Brianna (NCAR), Ryan, David Delene
Discussion
- 3D-PAWS, Status: Need to get Wifi. Will work with Andy. Going to WMI.
- GPS Location: Additional GPS Board put in Rassberry Pi, add a latitude/longitude to data stream.
- Brainna,
- Talked about measurement inter-comparison.
- New person, started in June.
- Nothing yet about intercomparison.
- Could get from CORES Web site. Please send me information.
- Vis Sensor
- Have one set of sensor
- Get together and take apart Vis sensor.
- Andrew - Work on 3D-PAWS.
Meeting next week. Thursday 11 Central.
August 27, 2020
Attending: Brianna (NCAR), Ryan, David Delene
Discussion
- 3D-PAWS Will on roof two today.
- Fixed 3D-PAWS is working.
- Visibility Sensor, We need to get the sensor connect so we get output. Photodector that we have is optical sensor IR 850nm Broadcom limite(APDS-9190, Digi-key 516-2663-1-ND, see Data Sheet).
Tasks
- Ryan
- Send link for data.
- Put links to sensor on visibility sensor page.
- See how to connect to Pi.
Meeting - Thursday at 1 pm. Have another meeting at 11 am
September 3, 2020
Attending: Brianna (NCAR), Ryan, David Singewald, David Delene
Discuss
- Wireless does not on roof. We get two 25 ft. cables. Emailed help desk. Need one 25 ft network cable and one 50 ft network cable.
- 4 ft metal support poles, 1.5 diameter. Winds bend the stand PVC.
- Going to order another power extension cable and power bars.
- We sent in request to order cable to make extension cables for the Met Trailer.
- API Key to get the data. Test to see if we can get data.
- Teamviewer is already installed.
Tasks
- David Delene
- Check on if API key work to get data.
- David Singewald
- Check the 3D sondi on Clifford Hall.
- Brianna
- Send information about Web display software. Will ask Maddi getting. Some back-end example 3D-PAWS, the we'll move to the instrument.
- GPS unit is still being tested. Will update when ready. For now, just do manual positions.
- Ryan
- Search Google Scholar and see find how to make 850 nm 42 degree visibility sensor.
- Put names of sensor and laser diode on the page.
- Link 64 SD cards for Pi version 4.
- Set standard Teamviewer password.
Try to be around on Sunday.
Talk next week at 1 pm Central.
September 10, 2020
Attending: Brianna (NCAR), Ryan, David Delene
Discussion
- Brianna
https://earthcubeprojects-chords.github.io/chords-docs/
- Ryan
- Will check on SD card.
- Getting Pis on the network.
- Re-image SD not working. Windows 10 Disk Image (has worded before). Ryan blanked and it did not work.
- The two metal poles work well.
- Issue with high winds affecting rain gauge.
- Visibility Sensor.
- Tasks
- David
- Sunday - Image the SD cards. Look more SD cards.
- Ryan
- Email Andy about wire network connections.
- Document rain gauge issue on Wiki, Work on Wiki.
David and Ryan will be in lab on Sunday. Meet Next Week..
October 1, 2020
Attending: Ryan Kucera, David Delene
Discussion
- Met Trailer 3d-paws. Extension cables are build.
- Tasks
- Ryan
- Check lap for Extension cord.
- Test Met 3d-paws in CH601 on Sunday.
- Plan to work on the visibility sensor.
- Plan to put 3d-paws outside of CH601.
- David
- Order additional extension cords. Sent Email to Wanda.
Plan on meeting at 1 pm next week.
October 8, 2020
Attending: Ryan Kucera, Brianna (NCAR), David Delene
Discussion
- 3D PAWS installed outside of CH601. See them on the link - https://www.youtube.com/watch?v=KSNC1Db-6wo&feature=youtu.be
Links
Tasks
- Ryan
- Get all instruments working on UND00200 and UND00300 outside of Clifford Hall 601.
- David
- Bring in USB to A/C adaptor.
Plan on meeting at 1 pm next week. Also be in 11-5 on Sunday.
October 15, 2020
Attending: Ryan Kucera, David Delene
Discussion
- Working on UND00300 (Met Trailer). Everything is getting data. Radiation shield issue. Wind and rain working to data but not going to data site.
- Visibility Sensor (Nothing new).
October 22, 2020
Attending: Ryan Kucera, Brianna (NCAR), David Delene
Discussion
- Web site issues.
- Ryan has UND00100 up in Clifford Hall 601 and on site. Without extension cables.
- Need to figure out how to anchor rain gauge to bricks outside of CH601.
- Should bring UND00300 inside to fix winds, but first need to UND00100 working with extension cables.
- Brianna
- Could learn on existing portal.
- Would have our CORDS portal. Visible is different.
- Could setup server. Could have our own Portal.
- Maddi to help with data/software side.
- David
- What first step in learning CORDS/data system.
Tasks
- Ryan
- Test extension cables.
- David
- In CORDS, change the location. I should have permission.