atmos:glacialridge:july_3_2013

This is an old revision of the document!


Participants: David Delene, Mark Provencher & Phondie Simelane

  • Purpose: To install new blower into sampler, to return folder of manuals, to return weed whacker and trim weeds, to investigate why weather data cannot be accesed on the website.

Summary of Events:

  • New blower installed into sampler. One wire to wire connnector is missing from the sampler (unable to connect blower to the power supply. Return trip was made to Grand Forks (Phondie Simelane) to see if the connector was on the old blower. Connector was not (and has yet to be found) in 423. Blower remains intact but not connected to a power supply.
  • PM 2.5 cyclone was assembled and placed on top of blank filter head (that remained from the last trip to fiedl site.