NASA IMPACTS 2022

  • Project: IMPACTS - Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms
  • Dates: January and February 2022
  • Location: North East (United States)
  • Platform: NASA P3
  • Tail Number: N426NA
  • Flight Level Processing Script: process_all_impacts

Links

Documentation

Note: The files below may be updated or added to frequently. Please view the most recent version on the UND “Aircraft” server in the locations listed.

  • Aircraft Configuration Document: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Configurations
  • Probe Operator Checklists: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Checklists
  • Probe Maintenance Checklists: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Checklists
  • M300 Tables: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/M300_Table_Archive
  • Ground Test Data: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/GroundData
  • Flight Data: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/FlightData

Items to Bring for January 2022

  • Probe Covers (HVPS, CDP, King, etc).
  • IPAD and holders
  • Cable Ties
  • Spare Network cables
  • Spare USB to Network adapters
  • Spare label maker tape
  • USB sticks for instruments

Items and Issues to Address Post-field Project

  • Set the HVPS3-B computer to not boot on power on. Have to remove cover and set jumper switch.
  • See about getting old M300 system booted or updated with new system.