====== October 23, 2008 ====== * Replaced 2 batteries in the UPS connected to GLACIALRIDGE2 * Turned on the three space heaters * Re-started the NOAA profiler PC (per Dave Carter's instructions) * Brought in rain gauge * Re-positioned snow board for sonic snow depth sensor * Collected three solar panels belonging to Duke University at remote USGS sites * Attempted to diagnose surface met. station issues, appears to be a network interface problem