atmos:3d-paws:und00300
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
atmos:3d-paws:und00300 [2021/03/06 18:37] – delene | atmos:3d-paws:und00300 [2022/02/22 17:10] – [Instrument Log] david.brannon | ||
---|---|---|---|
Line 7: | Line 7: | ||
* NCAR CHORDS ID - 66 | * NCAR CHORDS ID - 66 | ||
* Location - Clifford Hall Roof (South Side Pole Outside of Clifford Hall | * Location - Clifford Hall Roof (South Side Pole Outside of Clifford Hall | ||
- | * Status - Active, frame installed, rain gauge currently disconnected, | + | * Status - Testing |
==== TeamViewer Info ==== | ==== TeamViewer Info ==== | ||
Line 23: | Line 23: | ||
* 11/24/2020: Wind Vane is misaligned, data is inaccurate. Instrument removal needed to fix | * 11/24/2020: Wind Vane is misaligned, data is inaccurate. Instrument removal needed to fix | ||
* 12/18/2020: Reset power | * 12/18/2020: Reset power | ||
- | * 01/08/2021: Wind vane fixed but needs re calibration. Pi tube was blown off, may need glued on if issue recurs | + | * 01/08/2021: Wind vane fixed but needs re calibration. Pi tube was blown off, may need glued on if issue recurs |
- | + | * 03/15/2021: Station removed from roof of Clifford Hall | |
+ | * 05/09/2021: Testing and debugging. Pi currently running SD card labeled 3D-PAWS ver. 20210302. All instruments sending data sans Wind Vane. | ||
+ | * 02/15/2022: System updated and debugged. Currently in the process of repackaging and testing waterproofing measures. All instruments functioning but needs calibration. |
atmos/3d-paws/und00300.txt · Last modified: 2023/01/26 18:23 by david.brannon